This posting covers the past few weeks, and while not a lot work was done specifically by me having the floors finished has been one of if not the definitive change to make the interior look done. That being said most of the work for the past few weeks has been fishing small flooring projects that gone on the way side (a loose board here a missing step there, etc) and clearing out all the spaces. Since the kitchen and bathrooms had tile floors the whole operation was more or less crammed into those spaces prior to the finishing. The flooring company was scheduled, came out on time and was in and out within three days.
Having the floors finished left us with not a lot of things to do for the past week or so, except take some earned time to relax, have a bonfire with friends, and take the weekend off in northern MI. More importantly than the floors though or the general grind of working, I proposed to Amber on Sunday evening to which she said yes. So lots of great changes have happened and it looks like we will be on track to moving at some point during September.
Varnished trim drying |
Drying sticks of window casing |
Cutting Down the sticks |
First piece of the counter |
Amber clearing floor space |
Lynch grouting tile |
John and Kate at the Bonfire |
Shawnda Jenny and Sasha at the Bonfire |
Rocky macho Man |
The sign says it all |
Fermented fruits of our northern expadition |
Showcasing the floors |
Sun room |
Great Room staring to actually look great |
At El Azteco with my Fiance |
Congratulations!!!
ReplyDeleteSo excited to hear all the good news- Steve just told me on the phone and I had to check out the blog to read all about it. :D