Sunday, January 30, 2011

Wintered Windows


We finally have a room 90% drywalled (including the ceiling) which has turned into a convenient storage room for the project.  This couldn't have come soon enough because the materials have been coming in fast the past few weeks.  The replacement windows arrived last Thursday, forty sheets of drywall last Monday, two pallets of brick on Friday, Attic Insulation tomorrow, and the kitchen suite some point in February.
The project keeps moving forward with Lynch plugging away at the drywall and making sure all the walls are properly shimmed and plumbed.  Last week I ended up running hardwired cables for phone Ethernet and Coaxial to a control box in the basement.  Hopefully by next week we can have all the spaces between the trusses in the great room insulated, and prepped for drywall.

Drywall Jack and Replacement Windows

Storage Room

The Last piece of ceiling to have plaster board added

Lynch taking a page out my jobsite safety book (it is a super stable platform to get at the wall above the stairwell)


Rooms taking shape

Insulation put in between the floors (Amber's handywork)

More interfloor insulation

Furnace Thermostat

Control Cabinet

Control Cabinet Interior

Another Octopus was sighted