Sunday, October 31, 2010

Its halloween, Its haloween, the moon & Dave's electrical are shining bright

Electrical Boxes For Outlets, Switches, and Lights

 
 100 Watts of Progress!

(above) The Torn Out 100A Service 



New 200A Service Waiting to be Connected



Boxes Waiting to be Installed





                                                  
                                                   Dining Room Three Way Switch
 

 Can Lighting & Garbage Disposal Box


Wires Wires Everywhere


 The Bathroom Sink and Vanity Hook Up
 
 
 Before Grinding & After Grinding

 Wall #1 Stripped of Paint


 Repaired Exterior Archway


Bedroom Door framed in

Bathroom Door Framed In


Other Bedroom Door Half Framed In
 
Cast In Place Shower Stall Pan


The past few weeks have been exciting ones for the project.  The electrician started pulling cable and wires last Friday and since has the service switched out, the basement and first floor roughed in.  Doug has been working overtime on the plumbing which I do believe will be roughed in completely in a few more weeks.  Amber and Myself have been using a body grinder and sanding blades to remove an awful color of beige paint from the interior brick walls.  Things appear to be on schedule and I do believe that within three weeks everything should be insulated, plumbed, electrified and the heating system will be online.

2 comments:

  1. This looks wonderful! So proud of you and Amber! Soon enough we will all be hanging out there.

    ReplyDelete
  2. You actually make it seem so easy with your presentation but I find this topic to be really something which I think I would never understand. It seems too complicated and extremely broad for me. I’m looking forward to your next post, I will try to get the hang of it!
    skip bins rocklea
    skip bin hire brisbane

    ReplyDelete